Pasta Bridge Competition

Date: 5 March 2019


The Civil Engineering Challenge workshop was held on Tuesday March 5, 2019 for civil engineering and constructions technology students in Akkar campus. The aim of the workshop was to design and construct a Truss bridge, made from dry spaghetti and hot glue, in less than two hours.

The success of the bridge was assessed according to its strength (failure load) to weight (of bridge) ratio (SW).